Bedarfsanalyse

The survey on the design of your laboratory monitoring is divided into 4 sections:

1. infrastructure
2. equipment survey
3. runtime monitoring
4. IT infrastructure

After evaluating the data you provide, we can draw up an initial equipment plan and then provide you with an overview of costs.

Please note: Please send us a picture of a room plan (a smartphone picture of the fire protection plan is also sufficient here). Based on this, we can finalize the offer for the installation with you.